How to draw a site plan for a building permit

What plan check expects on the sheet, step by step, with a sample permit site plan.

By Amir Pakshir · Updated Nov 2026

Almost every building permit for an ADU, addition, pool, patio cover, fence or solar system starts with a site plan: one sheet that shows the lot, what is on it now, and what you are adding. Plan check returns more permits for an incomplete site plan than for any other sheet. This is what it needs, and how to draw it.

Example permit site plan for a detached ADU with key notes, project data and title block
A sample ADU site plan drawn with PARS Site Plan (fictional address). Download the sample PDF.

What the site plan must show

ItemWhat to draw or write
Project informationAddress, APN (assessor parcel number), owner, zoning, scope of work
North arrow and scaleStated scale (for example 1" = 20') plus a graphic scale bar
Property linesEvery lot line with its length; bearings if you have a survey
Existing buildingsHouse, garage, sheds, pool, with their outlines and use
New workOutline and size of the ADU, addition, pool or patio cover, clearly labeled "new"
SetbacksDimensions from the new work to each property line and to other buildings
Hardscape and accessDriveway, walks, parking spaces, fences and walls
Easements and utilitiesRecorded easements, and meters or lines when the city asks for them
Site dataLot area, building footprint, lot coverage, floor area and FAR where zoning limits them
StreetsStreet names and the curb or sidewalk along the front of the lot

How to draw it, step by step

  1. Get the parcel. Look up the APN, lot dimensions and zoning on the county assessor map or GIS viewer.
  2. Draw the lot to scale. Start with the property lines, then add the street in front.
  3. Add what exists. Trace buildings from aerial imagery or measure them on site: house, garage, accessory structures, pool, driveway.
  4. Add the new work. Draw its outline at the real size and label it.
  5. Dimension the setbacks. From the new work to each property line and to the nearest building. These are the numbers plan check reads first.
  6. Add the data and notes. Site data table, north arrow, scale, key notes and a title block with the address and APN.
  7. Print to scale. 11 × 17 at 1" = 20' works for most houses. Check a known dimension with a scale ruler before you submit.

Why site plans get sent back

Requirements vary by city; your building department's submittal checklist is the final word. Building an ADU? See ADU site plan requirements in California.

Questions people ask

What does a site plan for a building permit need to show?

The address and parcel number, north arrow, scale, property lines with dimensions, all existing buildings, the new work with its size, distances from the new work to property lines and other buildings, driveways and walks, and a title block. Many cities also ask for a site data table with lot area and lot coverage.

What scale should a site plan be?

Most residential lots fit on an 11 by 17 sheet at 1 inch = 10 feet or 1 inch = 20 feet. Larger lots use 1 inch = 30 or 40 feet. State the scale on the sheet and include a graphic scale bar.

Can I draw a site plan myself?

For most residential permits, yes: cities accept a drafted, non-certified site plan. It must be to scale and readable. A licensed surveyor is needed only when the city asks for a survey, for example when building close to a property line in a dispute.

Where do I find my property lines and parcel number?

The county assessor parcel map and the county GIS viewer show the parcel shape, dimensions and APN. A recorded survey or the grant deed legal description is more exact if you have one.